The meaning of breach in the construction industry
The term ‘breach’ can have several different meanings in the context of the built environment context.
In a legal sense, it refers to a failure to observe a legal responsibility, an agreement, regulation, code of conduct, and so on.
A breach of confidence is a failure to observe an agreement, often relating to private information that has been conveyed from one party to another.
A breach of a duty of care is a form of common law negligence.
If the one of the parties to a contract fails to perform as required, this may constitute a breach of contract. Such a breach may entitle the innocent party to make a claim for damages for the losses it has suffered.
A breach of contract can be a:
- Material breach: A breach which is serious, and the innocent party may also consider that it is discharged from any further obligations under the contract.
- Non-material breach: Also known as a default, this is a breach which is less serious. The innocent party may make a claim for damages, but may not consider it is discharged from any further obligations under the contract.
- Anticipatory breach: Also known as an anticipatory repudiation, this occurs when one of the parties to the contract declares to the other that they do not intend to perform their obligations under the contract.
For more information, see Repudiatory breach in construction contracts and Breach of contract.
The term irremediable breach refers to a situation in which there is a defect in the works for which the cost of rectification is unreasonable relative to the nature of the defect. Under these circumstances a deduction may be made from the amount payable relative to the amount by with the value of the works has been reduced by the defect.
For more information, see Irremediable breach.
The term may also be used in the context of a ‘security breach’ or ‘data breach’, which may relate to unauthorised access to a building or site, or a form of cyber-attack or data hacking. For more information see: Security breach.
It can also be used in the context of a default in a structure, such as a river breaching its bank, or floodwater breaching a wall.
[edit] Related articles on Designing Buildings
- Breach of contract.
- Causes of construction disputes.
- Cyber security and engineering.
- Defects.
- Derogation from grant.
- Determination.
- Irremediable breach.
- Leasehold covenants.
- Loss and expense.
- Material breach.
- Non-material breach.
- Repudiatory breach in construction contracts.
- Security breach.
- Termination.
Featured articles and news
The sad story of Derby Hippodrome
An historic building left to decay.
ECA, JIB and JTL back Fabian Society call to invest in skills for a stronger built environment workforce.
Women's Contributions to the Built Environment.
Calls for the delayed Circular Economy Strategy
Over 50 leading businesses, trade associations and professional bodies, including CIAT, and UKGBC sign open letter.
The future workforce: culture change and skill
Under the spotlight at UK Construction Week London.
A landmark moment for postmodern heritage.
A safe energy transition – ECA launches a new Charter
Practical policy actions to speed up low carbon adoption while maintaining installation safety and competency.
Frank Duffy: Researcher and Practitioner
Reflections on achievements and relevance to the wider research and practice communities.
The 2026 Compliance Landscape: Fire doors
Why 'Business as Usual' is a Liability.
Cutting construction carbon footprint by caring for soil
Is construction neglecting one of the planet’s most powerful carbon stores and one of our greatest natural climate allies.
ARCHITECTURE: How's it progressing?
Archiblogger posing questions of a historical and contextual nature.
The roofscape of Hampstead Garden Suburb
Residents, architects and roofers need to understand detailing.
Homes, landlords. tenants and the new housing standards
What will it all mean?